Qmc Group
Construction Consultant in The Hills Shire
www.qmcgroup.com
Address
Suite 208, 29-31 Lexington Dr. Bella Vista. The Hills Shire, NSW, 2153.Are you the owner or manager of this company?
What you should know about Qmc Group
We have successfully completed projects through a broad spectrum of construction including construction of power station and substation demolition detailed and bulk excavations roadworks bridges pipelines including communications, drainage, sewer and water railway construction and reconstruction building and building maintenance restoration and heritage works and environmental care works. MC Group's projects are everlasting complex and challenging. Other works include stone pitching to batters, rock protection to the bottom of the ramp, and an asphalt approach to the top of the ramp. Works include the demolition of existing pavement, installation of new storm water lines, installation of tree pits using strata cell systems, installation of granite Serb, installation of a combine of concrete unit and granite avers, installation of bollards, and landscaping. This project was initiated to alleviate traffic congestion in Dublin. Works included the construction of an entry ramp and hand railing, the rebuilding of 2 over pool shade structures including footings and fabrication of steel. Scope: This project involved the demolition, regrading and re sheeting of approximately 8500m2 of asphalt vehicle park, the reconstruction of roundabouts in Green Street and Cranky Street, and the associated external courteous works including the installation of fresh storm water lines and pits, footpaths and Serb ramps. Construction of a new truck, vehicle and equipment wash down facility to lessen weed and seed contamination in the Gladstone and surrounding Area. General Site works including environmental controls, retaining walls and drainage works. The major defy in this project is completing all works from the street side of the wall, with no access other than crane. Scope: This project involves the reconstruction of existing footpath and driveways from asphalt to granite avers. In addition, new definite driveways, footpaths and Serb and gutter. Scope: T his project involved the demolition and excavation of existing asphalt footpath, the construction of a reinforced definite bottom for paving, and laying of granite avers. Scope: This project involved the demolition and excavation of existing footpath pavement and construction of a granite paved footpath continuation across Penny’ Lane, and a widened the footpath up Kings Cranky Rd, which was a blend of granite and concrete unit avers to tie in with the existing pavements. Scope: This project involved the demolition of an existing park in Potts Point to construct new paved brick paved seating area. Works are to be completed to Main Roads standards and specifications and include installation of 128 precast boat ramp planks. Supply and installation of fresh boat ramp signage. MC Group also supplied and installed the electrical conduits and conducted the NAFTA hydro static testing. MC Group later took on the polite works including drainage, back filling of service trenches, service upgrades and relocation, constructing pliable pavements, Serbs and paths, widening roads, and constructing a roundabout and retaining wall. The project was completed using DTMR specifications, and was completed successfully including surplus works to the adjacent footpath of the school. This project needed a lofty glossy of management ability to ensure win in the required time frame. The works include removal of the existing bridge, fabrication and coating of the new bridge, and inst
Reviews of Qmc Group (0)