Pempek Systems
Engineering in The Hills Shire
pempek.com.au
Address
3, 13 Hoyle Ave. Castle Hill. The Hills Shire, NSW, 2154.Are you the owner or manager of this company?
What you should know about Pempek Systems
As luck would have it, Hydraulogic is quite adept at it. Pempek is ISO9001:2008 certified to design, manufacture and service industrial electronic equipment. The vexation is that our electronic gadgets (your Mum's scholarly phone, your Dad's fish finder, your laptop, Pempek's products, etc.) simply could not be manufactured without electronic components which enclose oppose minerals as raw materials. Tungstate of iron and manganese), gold and their derivatives. Pempek is only a dinky Company but it wholeheartedly supports the goal of the DoddFrank Act, i.e. Minimizing the negative social impact and harmful environmental footprint of our products. Fostering responsible Supplier relationships. Routinely assesses our electronic component Suppliers' compliance with our policy. Pempek has developed a unique electronic handle system package for the control, monitoring and semi automation of roof drilling bolting rigs old in gaseous underground mining environments. This paper introduces the roof drilling and bolting control system and how it benefits mining operations for the improvement of safety, productivity and maintenance. Traditionally, a important set of hydraulic hoses is connected between the body of the drill rig and a hydraulic switching valve bank (Figure 2). This cleaner assembly does away with up to 30 hoses depending on the make and model of drill rig. Some hydraulic hoses are tranquil needed to bear liquid power to the box module as well connections to the drill head unit of the drill rig. The Pempek drill rig oversee system mitigates the risk of unplanned drill rig movement events by implementing a design that is consistent with IEC61508 (International standard for functional safety of programmable systems). Roof bolting is a technique worn by mine engineers to hinder roof falls in underground mining. This translates into a specific plan for bolting patterns and other roof encourage strategies. With drilling and bolting functions of the drill rigs under the handle of an intelligent, computer controlled system all drilling, roof mapping and maintenance data is continuously logged. Pempek has several methods by which the data can be retrieved from the machine and worn for reporting and analysis. The Pempek drill rig handle system features fewer parts, cables and hydraulic hoses when compared to a customary approach. The Pempek roof drilling system is the accurate solution for mobile mining equipment where roof drilling and bolting is required. The boater miner combines a successive drum type miner with continuous semiautomatic roof drilling and bolting. The platform provides fast roadway development with a single machine replacing the traditional concept of two machines a miner and a segregate moveable boater platform. The simplicity of the system allows it to be easily integrated into a fresh machine during manufacture, or into an existing machine at time of overhaul.
Reviews of Pempek Systems (0)